Production lead · connected fictional workspace
Production
Order, materials, WIP, labour, wastage, quality, posting, and correction.
Coverage environment · Production is enabled by a server-shaped access snapshot (permission version 6, assurance AAL2). The production API independently rejects missing, cross-domain, and out-of-scope access; this fictional preview creates no credential.
Production control · PRD-0046 · BOM v4
Pendant light batch · 20 units planned
Exact authorityBOM v4 · effective 15 Aug 2026Base output 10 · scale 2.000 · snapshot retained
Approved · online posting allowedBatch PL-260821 · expiry 21 Aug 2028| Material | Plan | Available | Actual | Variance | Trace |
|---|---|---|---|---|---|
| Brass sheet · raw | 125 kg | 117.5 kg | — | −7.5 kg | Batch BR-822 |
| Electrical core | 20 ea | 28 ea | — | On plan | Batch EC-119 |
| Carton · packaging | 20 ea | 20 ea | — | On plan | Not expiry tracked |
Cost bridge
WIP remains source-linked
- Raw material
- ₹42,600
- Packaging
- ₹1,240
- Direct · setup · OT labour
- ₹4,350
- Direct expense + overhead
- ₹2,050
- Normal + abnormal wastage
- ₹640
- Scrap + by-product recovery
- −₹600
- Net batch / accepted unit
- ₹50,280 / ₹2,794
18 accepted units · allocation remainder ₹0
Quality & yield
Every output has a disposition
- Normal wastage · 1.2 kgcost absorbed
- Reusable brass scrap · 0.4 kg₹240 recovery
- By-product rings · 20 ea₹360 recovery
Correction boundary
Draft offline; reverse online
Usage, output and wastage may be saved locally against this approved cached order. Inventory, WIP and final costing post only after online validation.
Online · authority current